Project Details

(#149902)
Address/Location
341 Heights St, Stringtown, Oklahoma, 74569
Open Date 09/02/2025
Close Date 09/12/2025
Award Date 09/19/2025

Instructions

To submit a bid:

  1. Download the RFQ form
  2. Fill out the form
  3. Upload it when you click the “Submit Bid” button

All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.

Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.

  • Special Instructions

    Home is a 3-bed 2 bath, brick LEAP home approx. 1500 sq. ft. shingle roof. Slab on grade. All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view the job before bidding. The contractor is responsible for all line locates and permits required Contractor will be responsible for the cleanup and removal of all waste and repairing the yard back to mowing condition. The homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed. PM- Miranda Payne- 580-642-6573 Dustin Battles 580-317-7735

  • Doors

    Remove and replace the back entry doors. Install 1 pre-hung six-panel insulated metal door. Install all trim required for proper fit and finish. Install new combination, keyed alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes.

  • Drywall

    Remove and replace all damaged existing drywall, ceiling, and walls. Install new ½” drywall as needed, tape, bed, texture and paint to match new or existing finish

  • Landscaping

    Haul in topsoil to backfill around the foundation of the home. Add topsoil to the yard, filling all holes and grading out the whole yard. Apply sod to the topsoil after grading and leveling is complete. Make sure the yard is in good mowing condition upon completion.