This will be a 3-bedroom brick slab foundation 1200 s,q, Case Manager- Natilee Greenwood (580) 642-6359 Inspector- Rex Haines 580-317-3166
Special Instructions
All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Roofing
Hip, or semi-hip roof. Remove all shingles, felt, roof jacks, drip edge, and attic ventilation. Re-nail or replace decking as needed, fill all ventilation penetrations. Install new 30-year architectural shingles, 30# felt, drip edge, roof jacks, high-heat roof jacks for any gas appliance penetrations, and flashing required to complete the job. Install new continuous ridge vent for proper ventilation (May require decking at peak to be cut to allow for proper ventilation). Caulk and seal as needed for complete and proper finish. Participant to choose color. Ensure all vent piping is properly attached at appliance upon roof completion.
Vinyl Siding
Remove existing exterior siding on the soffit and fascia of the home. Replace the ceiling in the carport area to match and any areas of soffit and fascia where needed, before installing new vinyl (perforated as needed for proper ventilation), and siding on the entire home. Cover all exposed wood surfaces with PVC coated coil metal (Fascia). Replace any deteriorated Fascia approx. 140 lineal feet, and exterior trim needed before applying coil metal. Note- Contractor is responsible for all measurements.
Windows
Remove and replace all windows throughout the home. Install new insulated vinyl, low E, tilt sash windows. Repair any, and all damage due to window replacement, including paint, all trim, including window stools/sills if required, inside and out. Caulk and seal inside and out. Repair or replace any and all deteriorated framing as needed for proper repair. There are approximately 8 singles, 1 double windows in home. Contractor is responsible for exact window count and measurements.
Mechanical-HVAC
Remove and replace the existing HVAC unit. Install a new minimum 14.3 SEER2 rated energy efficient electric heat pump unit. Install new copper line-set, appropriate filter drier, thermostat, and registers. Caulk all ceiling drops to drywall before air register installation. Seal the return air cavity with drywall for energy efficiency. Insulate the duct where needed. Replace the plenum if required for proper fitment of the new unit. If duct board is to be used for transition to plenum, all joints must be foil-taped, and an acrylic latex or mastic sealant is to be applied over foil-taped joints. Ductwork that is to be installed or replaced under the home should be insulated metal pipe; flex duct is not to be used underneath the home. The contractor will be responsible for the proper sizing of the new unit. The contractor must provide the AHRI certificate for the equipment to be installed with the bid.
Plumbing
Make any repairs in the laundry room area on wastewater lines and water supply lines in this area to put all back to working order. Replace shutoff valves if needed.
Plumbing
Remove and replace tub/shower. Install new low entry shower base and surround, The surround will have to be out of tile do to window in this area. Install new mixer valve and new shower head with all new supply lines and all new waste water lines.. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Electrical
Check all outlets and wall switches in the home and put all back to working order where needed. Replace all overhead lights in all rooms of the home, bedrooms, bathroom, kitchen, hallway, and outside lights. with equal to what is there now. Putting all back to working order and all to Meet I.R.C.codes for 2019
Drywall
Make all sheetrock repairs in the home where needed, tape bed texture where needed, and do a complete and full painting of all rooms in the home, all ceilings, doors, trim, and baseboards in the home, and the front of cabinets in the bathroom and kitchen of the home. All in Choctaw white latex
Flooring
Remove existing floor covering throughout home, install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull toilet and install flooring up to the floor flange. Install all new trim required for proper fit and finish. Participant will choose color. (Flooring can be overlaid if removal
Special Instructions
The Contractor is to provide a storage container and move all the contents out of the house before working on the inside and back into the house after the job is completed.