Project Details
(#157006)Instructions
To submit a bid:
- Download the RFQ form
- Fill out the form
- Upload it when you click the “Submit Bid” button
All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.
Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.
Special Instructions
This will be a 3-bedroom brick slab foundation 1300 s,q, Case Manager Lacy Dodds-580-326-7521 Inspector-Rex Haines 580-317-3166
Special Instructions
All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Roofing
Hip, or semi-hip roof. Remove all shingles, felt, roof jacks, drip edge, and attic ventilation. Re-nail or replace decking as needed, fill all ventilation penetrations. Install new 30-year architectural shingles, 30# felt, drip edge, roof jacks, high-heat roof jacks for any gas appliance penetrations, and flashing required to complete the job. Install new continuous ridge vent for proper ventilation (May require decking at peak to be cut to allow for proper ventilation). Caulk and seal as needed for complete and proper finish. Participant to choose color. Ensure all vent piping is properly attached at appliance upon roof completion.
Air Conditioning
The HVAC is 4 Years old; we will not be doing a replacement on this. But install a new plenum and all new flex ductwork in all rooms of the home, all joints must be foil-taped, and an acrylic latex or mastic sealant is to be applied over foil-taped joints. Install a new thermostat and service hvac unit to make sure all is in working order. Install all new registers. Note- clean all coils and fan motors on the unit Note- Contractor is responsible for the measurements and count of registers.
Doors
Remove and replace 1, side entry doors. Install 1 pre-hung six panel insulated metals doors. Install all trim required for proper fit and finish. Install new combination, keyed alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes.
Windows
Remove and replace all windows throughout the home. Install new insulated vinyl, low E, tilt sash windows. Repair any, and all damage due to window replacement, including paint, all trim, including window stools/sills if required, inside and out. Caulk and seal inside and out. Repair or replace any and all deteriorated framing as needed for proper repair. There are approximately 4 singles, 2 double windows in home. Contractor is responsible for exact window count and measurements.
Electrical
Install smoke alarms in the living room ceiling that is missing with a hard-wired and battery backup.