This will be a 3-bedroom brick slab foundation 1300 s,q, Case Manager Lacy Dodds 580-326-7521 Inspector- Rex Haines 580-317-3166
Special Instructions
All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Plumbing
Remove and replace the hot water tank with a new 40-gal electric with an overflow pan under the tank. All new supply lines and new shut-off valves. ALL TO MEET ALL I.R.C..codes for 2019
Air Conditioning
Install one new air register in the bedroom add-on where one is missing.
Electrical
In the bedroom add-on. The customer has installed wiring for the ceiling fan. Install a new outlet box for the fan and install a new ceiling fan with a light kit. Install a new wall switch and outlet box any and all electrical to complete the new install.