Project Details

(#159184)
Address/Location
438 N 4080 RD., Soper, Oklahoma, 74759
Open Date 03/17/2026
Close Date 03/30/2026
Award Date 04/08/2026

Instructions

To submit a bid:

  1. Download the RFQ form
  2. Fill out the form
  3. Upload it when you click the “Submit Bid” button

All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.

Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.

  • Special Instructions

    Home is a 3-bed 2 bath, brick home approx. 1500 sq. ft. shingle roof. Slab on grade. Property Manager: Lacey Dodds 580-642-6122 Inspector: Levi Methvin 580-642-1169 All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.

  • Roofing

    Hip roof. Remove all shingles, felt, roof jacks, drip edge, and attic ventilation. Re-nail or replace decking as needed, fill all ventilation penetrations. Install new 30-year architectural shingles, 30# felt, drip edge, roof jacks, high-heat roof jacks for any gas appliance penetrations, and flashing required to complete the job. Install new continuous ridge vent for proper ventilation (May require decking at peak to be cut to allow for proper ventilation). Caulk and seal as needed for complete and proper finish. Participant to choose color. Ensure all vent piping is properly attached at appliance upon roof completion.

  • Air Conditioning

    Remove and replace the existing HVAC unit. Install a new minimum 14.3 SEER2 rated energy efficient electric heat pump unit. Install new copper line-set, appropriate filter drier, thermostat, and registers. Caulk all ceiling drops to drywall before air register installation. Seal the return air cavity with drywall for energy efficiency. Insulate the duct where needed. Replace the plenum if required for proper fitment of the new unit. If duct board is to be used for transition to plenum, all joints must be foil-taped, and an acrylic latex or mastic sealant is to be applied over foil-taped joints. The contractor will be responsible for the proper sizing of the new unit. The contractor must provide the AHRI certificate for the equipment to be installed with the bid.

  • Drywall

    Repair cracked sheetrock in master bathroom ceiling. Install new ½” drywall, tape, bed, texture and paint entire ceiling. Repair cracked drywall in living room walls. Install new 1/2" drywall, tape, bed, texture and paint entire living room. Homeowner to choose color. Repair damaged dry wall in master bedroom. Install new 1/2"drywall, tape, bed, texture and paint entire bedroom. Homeowner to choose color.

  • Plumbing

    Remove and replace shower head/faucet in hall bathroom. Caulk and seal as needed with clear waterproof sealant.

  • Special Instructions

    All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.