Project Details

(#160182)
Address/Location
1107 N CENTRAL AVE, Idabel, Oklahoma, 74745
Open Date 02/03/2026
Close Date 02/17/2026
Award Date 03/11/2026

Instructions

To submit a bid:

  1. Download the RFQ form
  2. Fill out the form
  3. Upload it when you click the “Submit Bid” button

All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.

Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.

  • Special Instructions

    Home is a 3-bed 2 bath, brick home approx. 1536 sq. ft. shingle roof. Slab on grade. Property Manager- Lacey Dodds 580 642 6122 Inspector- Corey James 580 317 7088 All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.

  • Drywall

    Remove and replace damaged ceiling in living, dining, hallway and kitchen. Replace damaged sheetrock in laundry room. Install new ½” drywall, tape, bed, texture and paint ceiling living, dining, hallway's and kitchen. Paint Laundry room.

  • Electrical

    Remove and replace back bathroom exhaust fan. Include new switch and cover plate. Install per manufactures installation.

  • Windows

    Remove and replace 1 back window in the home. Install new insulated vinyl, low E, tilt sash window. Repair any, and all damage due to window replacement, including paint, all trim, including window stools/sills if required, inside and out. Caulk and seal inside and out. Repair or replace any and all deteriorated framing as needed for proper repair. There are approximately 1 single window in home. Contractor is responsible for exact window count and measurements. Replace 2 window screens.

  • Finish Carpentry

    Install new dryer vent cover on exterior. Include flap to prevent pest intrusion. Silicone and seal.

  • Special Instructions

    All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.