Project Details
(#161242)Rehab, Tribal, HMS, LEAP
Instructions
To submit a bid:
- Download the RFQ form
- Fill out the form
- Upload it when you click the “Submit Bid” button
All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.
Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.
Special Instructions
Patriots way LEAP SITE Case Manager Maegan Russell-580-326-7521 Inspector- Rex Haines 580-317-3166
Special Instructions
All prospective contractors are required to visit the project before submitting bid. Change orders due to conditions that could have been identified during the visit will not be Considered or approved.
Tree Removal
At the backside of all homes starting at front of property at side of home at 731 15th going all the way behind all homes on Patriotes way st to the home 1731 at the corner of Freedom st. Remove all trees and brush from area where new fencing is to be installed and level ground where needed for install of new fence all waste is to be removed by contractor and all clean up needed by contractor.
Fencing
At the side of 731, 15th going behind all homes on Patriotes way st to home 1731 at the corner of Patriots way.and Freedom st. Install 8ft privacy fence tying end to privacy fence at Freedom st ,all materials to match fence on Freedom in appearance height and stain. All post out of metal with all hardware needed, all fencing to be wood cedar planks 8ft, all post in concrete 3ft, stain fence to match color of fence on Freedom st all to match fence on Freedom. APPROX 1000 ft of fencing to install. NOTE-Contractor is responsible for all measurements, line locations and to get with the Hugo office for where property lines are located.