Project Details
(#168051)Instructions
To submit a bid:
- Download the RFQ form
- Fill out the form
- Upload it when you click the “Submit Bid” button
All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.
Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.
Special Instructions
Home is a 3-bed, 2-bath brick home approx. 1500 sq. ft., shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions, please call. Property Manager _ Lacey Dodds @ 580-642-6122 Inspector - David Trowbridge @ 580-775-8512 All work done must meet or exceed the 2019 IRC. All applicable licenses apply. It is highly recommended contractor view the job before bidding. The contractor is responsible for all line locates and permits required. The contractor will be responsible for the cleanup and removal of all waste and restoring the yard to mowing condition. The homeowner will select any/all colors used for the job. The contractor is responsible for all measurements and count of materials needed.
Roofing
Hip roof. Remove all shingles, felt, roof jacks, drip edge, and attic ventilation. Re-nail or replace decking as needed, fill all ventilation penetrations. Install new 30-year architectural shingles, 30# felt, drip edge, roof jacks, high-heat roof jacks for any gas appliance penetrations, and flashing required to complete the job. Install new continuous ridge vent for proper ventilation (May require decking at peak to be cut to allow for proper ventilation). Caulk and seal as needed for complete and proper finish. Participant to choose color. Ensure all vent piping is properly attached at appliance upon roof completion.
Plumbing
Master bathroom: Remove and replace the vanity top and sink. Remove and replace both bathroom vanity faucets, supply lines with shut-off valves, and drain lines; replace both shower faucets/mixing valves. Install Delta or comparable faucets/mixing valves. Install inspection plates in closets behind each shower valve. (two inspection plates) Repair/replace any all drywall, trim, sub and finish flooring, and paint needed due to repairs.
Drywall
Repair the ceiling in the hall bathroom, tape, bed, texture, and paint the bathroom ceiling, walls, door, and trim. Use an interior latex paint min. of two coats for proper coverage. The homeowner will choose a color.
Electrical
Replace the GFCI outlet and cover on the front porch.
Gutter Installation or repair
Install new seamless guttering around the entire house, including downspouts with concrete splash blocks at each downspout, and downspouts are to be turned so the water will flow away from the foundation of the home.