Project Details

(#168606)
Address/Location
304 West 3rd, Heavener, Oklahoma, 74937
Open Date 07/30/2026
Close Date 08/11/2026
Award Date 08/11/2026

Instructions

To submit a bid:

  1. Download the RFQ form
  2. Fill out the form
  3. Upload it when you click the “Submit Bid” button

All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.

Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.

  • Special Instructions

    Home is a 4-bed, 2-bath pier-and-beam frame home, approx. 2800 sq. ft. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions, please call. Case Manager - Ferne Gunn @ 580-642-6318 Inspector - David Trowbridge @ 580-775-8512 All work done must meet or exceed the 2019 IRC. All applicable licenses apply. It is highly recommended that contractors view the job before bidding. The contractor is responsible for all line locates and permits required. The contractor will be responsible for the cleanup and removal of all waste and restoring the yard to mowing conditions. The homeowner will select any/all colors used for the job. The contractor is responsible for all measurements and count of materials needed.

  • Plumbing

    Master bathroom: approx. 6 ' x 8 '. Remove and replace the stand-up shower, faucet, and drain. Install a new low-entry shower base and surround with Swan-Stone or comparable; it must be a minimum of 1/4” thickness. Replace the shower handle and mixing valve with Delta or a comparable brand. Install a new shower faucet and rod. FRP will not be accepted as a tub/shower surround. Remove existing floor covering in master bathroom; replace all deteriorated subflooring; install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull toilet and install flooring up to the floor flange. Install all new trim required for proper fit and finish. The homeowner will choose color. Repair/replace all drywall, trim, sub and finish flooring, and paint needed due to repairs.