Project Details
(#162209)Instructions
To submit a bid:
- Download the RFQ form
- Fill out the form
- Upload it when you click the “Submit Bid” button
All bids must have an actual price good date and be itemized to be considered a valid quote. Any bids received without the requested information will be voided. All bids must be received by 4:30 p.m. on the due date.
Please be advised that all bid submissions must be submitted exclusively through the Housing Bid Board unless otherwise noted for Request for Proposals (Sealed Bids). Any bids submitted via email, mail, or other means will not be accepted or considered.
Special Instructions
Home is a 3-bed 2 bath, brick home approx. 1600 sq. ft. shingle roof. Slab on grade. Property Manager- Lacey Dodds 580 642 6122 Inspector- Corey James 580 317 7088 All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved.
Plumbing
Hall Bathroom ADA shower, remove and replace tub/shower. Install new tiled base and wall walk in shower. Install new glass sliding door and seal. Replace shower handle and mixing valve with Delta or comparable. Install 2 ADA grab bars, adjustable height handheld shower faucet with its own adjustable guide rod apart from the grab bars. and portable seat. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint bathroom. Add-on Tub/Shower Combo, Remove and replace tub/shower. Install new tub/shower combo and surround, with Swan-stone or comparable, must be a minimum of 1/4’’ thickness. Replace shower handle and mixing valve with Delta or comparable. Install 2 grab bars. Install new Removeable handheld shower faucet. FRP will not be accepted as a tub/shower surround. Repair/replace any all drywall, trim, sub and finish flooring, and paint bathrooms. (Will need to do drywall mildew on wall by tub, repair or replace plumbing if needed.)
Special Instructions
All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.